FSK L&S · WEEKLY MARKET INTELLIGENCE
Week 41 · 2026
2026 / WEEK 41 · 10.05 – 10.11

Air capacity varies by route;
ocean deliveries depend on onward connections

As shipments resume after the holidays, available air capacity differs by origin and destination. In ocean freight, shorter vessel waits in China and Busan coexist with congestion in Southeast Asia. Empty-container returns in Manila and inland connections in Europe remain factors in final delivery schedules.

AIR · Global cargo volume+9%Year on yearSeptember 2026 · +3% month on month OCEAN · Busan → Southeast Asia$1,622/ FEU+16.6% week on weekAs of Oct 6 · 40-foot container PORTS · Shanghai average vessel wait3.51daysSep 29: 3.66 days → Oct 6: 3.51 days7-day moving average · Easing continues INLAND · Rotterdam barge wait56hoursAverage wait for handlingAs of Oct 6 · Antwerp: 36 hours
Market as of 2026.10.12 Week 41: Oct 5–11 · Monthly air data: September; weekly air data: Sep 28–Oct 4 · Reference dates shown for each item
01 / THIS WEEK

This week's highlights

Post-holiday shipment recovery
and connections along each route
02 / AIR

Air freight

Separate monthly growth from holiday-week changes
and assess space by origin and destination
GLOBAL AIR CARGO · September and the holiday week

September growth continued;
post-holiday recovery differs by route

Global air cargo volume rose 9% year on year and 3% month on month in September. However, volume fell 2% from the previous week over September 28–October 4 as the holidays began, combining monthly growth with a short-term shipment slowdown.

Global air cargo volume+9%Year on year · +3% month on monthSeptember 2026
China → US cargo volume+17%Year on yearSeptember 2026
Global weekly cargo volume−2%Week on week · Holiday effectWeek 40 · Sep 28–Oct 4

In the same month, mainland China and Hong Kong cargo to Europe fell 10% year on year. Demand continues to differ by destination, with AI, server and semiconductor equipment supporting Asia–North America flows. For post-holiday China-origin volumes, the immediate question is a return to normal shipments rather than an abrupt peak-season surge.

Weekly Check Point

Align each factory's restart date with actual shipment volume, and confirm flights that can carry the dimensions and weight of equipment or oversized cargo. Plan dispatch around flights available for the required arrival date and final handover time, separately from monthly market growth.

KOREA TO US · Capacity by destination

Within the US,
Midwest, West and East capacity differs

Industrial demand has tightened nonstop capacity from Korea to the US Midwest, increasing demand for connecting flights. Incheon–LA space is also tight, while consolidator charters reportedly offer more room to the East Coast. China–Midwest traffic follows a different pattern, with the holiday slowdown coinciding with added capacity.

Asia–North America charter flights continue to expand, but some capacity is dedicated to specific customers and routes. More flights do not necessarily mean ample space for general bookings.

Weekly Check Point

Choose the arrival airport to match the final delivery region and confirm actual uplift and connection times for nonstop or connecting flights. For transfers, align the hub's handling requirements with onward trucking and factory receiving hours.

BANGKOK & INDIA · Airport handling

Bangkok backlog remains after restrictions lift;
Mumbai cargo depends on the actual operating airport

Thai Airways has lifted cargo acceptance restrictions in Bangkok, but backlogs remain at the TG and BFS terminals, with newly available bookings reportedly pushed into the following week. Resumed acceptance does not guarantee immediate uplift.

In Mumbai, freighter cancellations following runway work and the relocation of some flights are diverting cargo to Ahmedabad and Bengaluru. Alternative airports also face handling pressure, so the booked airport must match the actual cargo acceptance location.

Weekly Check Point

For Bangkok, confirm both terminal acceptance times and the flight with secured uplift. In India, dispatch trucks after confirming the operating airport, terminal and cutoff. If the airport changes, allow for the additional road leg and revised final handover date.

03 / OCEAN

Ocean freight

Market indicators point in different directions;
service routes and available sailings matter
TRANS-PACIFIC & EUROPE · Service changes

US rates pause near their highs;
Europe combines Suez returns with blank sailings

On October 9, Shanghai–US West Coast market rates were $7,584/FEU and East Coast rates $10,524/FEU, close to the previous release. North Europe rose 3.4%, but a separate Rotterdam assessment on October 8 fell 1.8%, so the figures do not show a consistent recovery across Europe.

Shanghai → US West Coast$7,584 / FEU+0.1% vs. previous releaseOct 9 · 40-foot container
Shanghai → North Europe$2,274 / TEU+3.4% vs. previous releaseOct 9 · 20-foot container
Upcoming major east–west blank sailings34 sailingsAbout 5% of 713 scheduled sailingsWeeks 42–46 · Oct 12–Nov 15 outlook

Half of the blank sailings scheduled over the next 5 weeks are on Asia–North Europe and Mediterranean routes. These figures count cancelled sailings, not actual on-time arrival performance. Whether a sailing operates and whether port delays change its arrival date are separate checks.

Some carriers are expanding Suez routing, and ONE also plans to switch European services. Shorter routes can improve vessel rotation, but implementation dates and ships differ, so transit times will not shorten uniformly for every booking.

Weekly Check Point

Confirm that the booked sailing will operate and identify alternative departure dates. For Europe, verify actual Suez routing, port rotation and the updated arrival date, then align customs clearance, rail or truck connections and warehouse appointments.

INTRA ASIA · Southeast Asian connections

The regional average edged lower;
Busan–Southeast Asia rates continued to rise

+16.6% Busan → Southeast Asia rate · Week on week
$1,622 / FEU · As of Oct 6

The intra-Asia composite rate stood at $1,503/FEU on October 8, down 1.0% week on week. Shanghai–Singapore and Tanjung Pelepas rose 2.4% and 2.1%, respectively, while Busan–Southeast Asia also increased sharply. Supply and demand differ substantially by origin and lane.

Congestion has recently increased in Singapore, Port Klang and Cai Mep. As China-origin shipments recover after the holidays, handling speed at transshipment hubs could affect connections.

Weekly Check Point

Distinguish direct Southeast Asian shipments from transshipment cargo. For transfers, check the first vessel's arrival against the connecting vessel's cutoff. When connections change, update terminal gate-in and factory or warehouse handover schedules together.

SOUTH ASIA · Transshipment hubs

Colombo waits have shortened;
India-origin onward connections still need attention

Vessel waits in Colombo have reportedly eased from up to 5 days in the second half of September to around 2 days recently. Continued capacity expansion at new terminals signals improvement since the previous issue.

India's JNPA and Mundra are absorbing cargo diverted from the Middle East, adding pressure to yards and inland handling. More hub options do not ensure the same feeder-to-mainline connection capacity at every port or service.

Weekly Check Point

For India-origin cargo, check feeder arrival, mainline port calls and transshipment cutoffs as one sequence. If the transfer hub changes, confirm space on the onward sailing and the final arrival date before updating the delivery schedule.

Key lane rates at a glance
Origin → DestinationRateVs. previous releaseAs of
Shanghai → US West Coast$7,584 / FEU+0.1%10/9
Shanghai → US East Coast$10,524 / FEUBroadly unchanged10/9
Shanghai → North Europe$2,274 / TEU+3.4%10/9
Shanghai → Southeast Asia$1,159 / TEU−1.0%10/9
Shanghai → Singapore$2,123 / FEU+2.4%10/8
Busan → Southeast Asia$1,622 / FEU+16.6%10/6

TEU refers to a 20-foot container and FEU to a 40-foot container. October 9 figures are compared with the September 30 release; other changes are week on week. These market reference figures differ in origin, unit and coverage and are used to assess market direction separately from customer contract rates.

04 / OPERATIONS

Ports & inland operations

As vessel waits ease,
follow the chain through cargo release and final handover
CHINA & BUSAN · Shorter waits

Shanghai, Ningbo and Busan improve;
watch the holiday recovery and onward connections together

As of October 6, 7-day average vessel waits were 3.51 days in Shanghai, 2.37 days in Ningbo and 1.22 days in Busan, all below September 29 levels. Busan fell from 2.00 days, easing the rising waits reported in the previous issue.

Shanghai average vessel wait3.51 daysSep 29: 3.66 days → Oct 6: 3.51 days7-day moving average
Ningbo average vessel wait2.37 daysSep 29: 2.51 days → Oct 6: 2.37 days7-day moving average
Busan average vessel wait1.22 daysSep 29: 2.00 days → Oct 6: 1.22 days7-day moving average

Busan's yard space remains limited despite shorter vessel waits. If China's post-holiday shipment recovery overlaps with Southeast Asian hub congestion, improving port averages may not translate into better connections for individual shipments.

Weekly Check Point

Confirm actual berthing dates and gate-in cutoffs at the assigned terminal. For Busan transshipments, review the buffer between inbound arrival and the connecting departure. If the connection changes, adjust the final arrival date and warehouse handover appointment together.

PHILIPPINES · Empty returns and bookings

Manila faces empty-return bottlenecks;
carrier-specific booking restrictions remain

Limited empty-container return capacity in Manila is slowing truck turnaround. Hapag-Lloyd has suspended new bookings to 3 ports: Manila, Batangas and Subic Bay. This is a carrier-specific measure, not a suspension of all shipping services in the Philippines.

Blocked empty returns also affect import-container pickup and subsequent truck assignments. Batangas and Subic Bay are included in the same carrier's restrictions, so simply changing the destination port does not establish a workable alternative.

Weekly Check Point

For new bookings, first confirm acceptance by carrier and destination port. For cargo already at destination, coordinate pickup appointments, designated empty-return depots, truck assignments and warehouse receiving times.

EUROPE INLAND · Onward connections

German port strike risk eases;
Rhine constraints and barge delays persist

The October 6 German port labor agreement reduced the risk of further strikes. However, yard pressure at some ports and barge loading limits caused by low Rhine water levels persist, so port operations and inland recovery need separate assessment.

56 hours / 36 hours
Rotterdam / Antwerp average barge handling wait · Oct 6

Even when vessels reach North European ports on schedule, actual barge loading capacity and sailing times can change the handover date in inland Germany.

Weekly Check Point

Check ocean arrival together with barge schedules and available loading capacity. If rail or truck connections are needed, align dispatch, completed customs clearance and warehouse receiving dates to confirm the final delivery schedule.

05 / NEXT WEEK

Next week's watchlist

Week 42 · Oct 12–18 shipments
and six checks for onward arrival schedules
US-bound airConfirm arrival airport

Available flights to the Midwest, West and East

Match nonstop or connecting flight space and transfer times to the final delivery region. For oversized equipment, include dimension and weight limits and onward truck handover.

Bangkok & India airBefore airport delivery

Acceptance times and operating airport

After Bangkok's restrictions lift, confirm actual terminal acceptance and uplift. For India, reflect any operating-airport change and additional road leg in cargo delivery schedules.

US & Europe oceanCheck booked sailings

Operating sailings and Suez routing

Check blank-sailing plans and alternative departure dates. For Europe, adjust customs clearance and inland connection bookings to the actual route and revised arrival date.

Asian transshipmentOnward vessel connection

Buffer before the mainline cutoff

For cargo via Busan, Southeast Asia or Colombo, confirm terminal handling capacity and secured space on the connecting sailing. Better port averages do not guarantee an individual connection.

PhilippinesBookings & cargo movement

Carrier acceptance and empty-return depots

Check new-booking acceptance by carrier for Manila, Batangas and Subic Bay. For arrived cargo, coordinate pickup, empty returns, trucking and warehouse receiving times.

Europe inlandBefore port arrival

Barge loading and final handover

Confirm actual Rhine sailings and loading capacity. For cargo requiring rail or truck connections, secure dispatch and warehouse appointments together.

After the holidays, align factory restarts and actual loading dates, along with connections through to final handover. Reflect changes to flights, sailings, terminals and inland transport in one coordinated delivery plan.